The platform

Molasses now. A plant only if it is funded.

Eco Doliya is a circular bioeconomy company that is not yet in production. Investment has not come in, so there is no facility in sight. The commercial product is Apong molasses. Everything about tonnes of food waste is a design for Plant 1, not an operation.

What exists, and what does not.

One product is on sale. The rest of the platform is a case for capital. Climate at scale starts when food waste actually reaches a plant — and that plant has no site and no money yet.

  1. Now

    01Apong molasses

    Farms and households. The product we can sell. Soil enhancer for plants. Kitchen-waste odor and pest control at home.

  2. Unfunded

    02Organic fertilizer

    Once a plant exists. The commercial facility would make fertilizer from food waste. It has not been built.

  3. Unfunded

    03Collection & processing

    Only with a facility. No site, so no collection service. Feedstock talks wait on capital.

  4. Later

    04Biogas

    After the plant, if developed. Not a current activity. The design keeps the train bioenergy-ready.

  5. Later

    05Carbon

    Only if a project is verified. Nothing to claim today. No diversion tonnes are being processed.

Unit, per tonne of feedstock

The machine, reduced to one tonne.

This is the design logic for an unbuilt plant. Not a result, not a sales forecast, and not something operating in Kota Samarahan.

Food waste in
1 tonne
Fertilizer out
400 kg
Conversion
about 40%
Dual use
Soil enhancer · kitchen odor and pest control
Community
Works with communities to own the climate work
Plant 1
Designed, not built

Plant 1 · design only

A plant for Kota Samarahan. Unfunded, unsited, not under construction.

Designed capacity
100 tonnes / day
Operating year
330 days
Annual feedstock*
33,000 tonnes at full use
Fertilizer*
13,200 tonnes at 40%
Status
Design only · no capital closed

* Illustrative design figures for a facility that has not been financed or sited. None of these tonnes are being processed.

The ramp starts after capital.

Year 1 would be construction, not a sales year — and Year 1 has not begun. There is no lease, no equipment order, and no commissioning date until investment arrives.

  1. Year 1

    Build

    Retrofit, install, test

  2. Year 2

    40%

    Commercial launch

  3. Year 3

    70%

    Customers and efficiency

  4. Year 4

    90%

    Stable production

  5. Year 5

    100%

    Full use, ready to copy

What the biology has to do.

  • Higher throughput without a fragile process.
  • Batch-to-batch consistency a buyer can trust.
  • Commercial scale that still runs simply.
  • Quality assurance before anything leaves the floor.

How the network expands.

  1. 1

    Fund it

    Plant 1 is a design for Kota Samarahan. No capital has closed, so nothing is under way.

  2. 2

    Cross Sarawak

    Further facilities, each a standard unit for its own valley.

  3. 3

    Through Borneo

    The same loop, where feedstock and customers justify it.

  4. 4

    Only then, further

    Wider markets if the unit is still the right answer.