The platform
Molasses now. A plant only if it is funded.
Eco Doliya is a circular bioeconomy company that is not yet in production. Investment has not come in, so there is no facility in sight. The commercial product is Apong molasses. Everything about tonnes of food waste is a design for Plant 1, not an operation.
What exists, and what does not.
One product is on sale. The rest of the platform is a case for capital. Climate at scale starts when food waste actually reaches a plant — and that plant has no site and no money yet.
- Now
01Apong molasses
Farms and households. The product we can sell. Soil enhancer for plants. Kitchen-waste odor and pest control at home.
- Unfunded
02Organic fertilizer
Once a plant exists. The commercial facility would make fertilizer from food waste. It has not been built.
- Unfunded
03Collection & processing
Only with a facility. No site, so no collection service. Feedstock talks wait on capital.
- Later
04Biogas
After the plant, if developed. Not a current activity. The design keeps the train bioenergy-ready.
- Later
05Carbon
Only if a project is verified. Nothing to claim today. No diversion tonnes are being processed.
Unit, per tonne of feedstock
The machine, reduced to one tonne.
This is the design logic for an unbuilt plant. Not a result, not a sales forecast, and not something operating in Kota Samarahan.
- Food waste in
- 1 tonne
- Fertilizer out
- 400 kg
- Conversion
- about 40%
- Dual use
- Soil enhancer · kitchen odor and pest control
- Community
- Works with communities to own the climate work
- Plant 1
- Designed, not built
Plant 1 · design only
A plant for Kota Samarahan. Unfunded, unsited, not under construction.
- Designed capacity
- 100 tonnes / day
- Operating year
- 330 days
- Annual feedstock*
- 33,000 tonnes at full use
- Fertilizer*
- 13,200 tonnes at 40%
- Status
- Design only · no capital closed
* Illustrative design figures for a facility that has not been financed or sited. None of these tonnes are being processed.
The ramp starts after capital.
Year 1 would be construction, not a sales year — and Year 1 has not begun. There is no lease, no equipment order, and no commissioning date until investment arrives.
Year 1
Build
Retrofit, install, test
Year 2
40%
Commercial launch
Year 3
70%
Customers and efficiency
Year 4
90%
Stable production
Year 5
100%
Full use, ready to copy
What the biology has to do.
- Higher throughput without a fragile process.
- Batch-to-batch consistency a buyer can trust.
- Commercial scale that still runs simply.
- Quality assurance before anything leaves the floor.
How the network expands.
- 1
Fund it
Plant 1 is a design for Kota Samarahan. No capital has closed, so nothing is under way.
- 2
Cross Sarawak
Further facilities, each a standard unit for its own valley.
- 3
Through Borneo
The same loop, where feedstock and customers justify it.
- 4
Only then, further
Wider markets if the unit is still the right answer.
